Charcon Construction Solutions supplies new Adventure Centre in Derbyshire

Charcon Construction Solutions supplies new Adventure Centre in Derbyshire

Charcon Construction Solutions supplies new Adventure Centre in Derbyshire

Precast concrete products manufacturer, Charcon Construction Solutions has supplied and installed structural precast concrete materials for Mount Cook Adventure Centre in Derbyshire.

Main contractor Novus specified Charcon’s Block and Beam flooring system, composed of pre-stressed concrete beams with standard concrete infill blocks laid in between, for the complicated central core area on the ground floor. Pre-stressed Hollowcore flooring slabs, which range from 150mm to 400mm and achieve a rapid strength of over 60N, at only 28 days, were then used to floor the building’s rectangular wings. A heavy density Hollowcore sound slab was used on the first floor and roof level to effectively meet sound regulations. Two pre-cast staircases, ground to upper floor levels, manufactured using custom built moulds, were also supplied and installed.

Richard Baldry, general manager for Charcon Construction Solutions, said:

“Using our precast Block and Beam and Hollowcore flooring systems meant there was no need to wait for concrete slabs to cure. Once grouted, floors formed a ready-to-work base for follow on trades. Additionally, Hollowcore is very easy to transport and handle during construction, and requires less material to manufacture compared to solid concrete slabs.”

Visit: www.charconcs.com

enewsletter